Backup problem using DDS4

Configuration:
Adaptec 2940UW controller
Seagate Scorpion STD2401LW tape drive
SCSI LVD hard drives (mixed manufactures and sizes)
20 G capacity DDS4 tapes
5 G max data

PROGRAM NAME VERSION DATE
sys/Proc32 Proc 4.25I Nov 25 1998
sys/Proc32 Slib16 4.23G Oct 04 1996
sys/Slib32 Slib32 4.24B Aug 12 1997
/bin/Fsys Fsys32 4.24T Feb 26 1999
/bin/Fsys Floppy 4.24B Aug 19 1997
/bin/Fsys.aha7scsi scsi 4.24M Mar 23 1998
//1/bin/Dev32 Dev32 4.23G Oct 04 1996
//1/bin/Dev32.ansi Dev32.ansi 4.23H Nov 21 1996
//1/bin/Pipe Pipe 4.23A Feb 26 1996
//1/bin/cron cron 4.23B Oct 30 1997
//1/bin/Dev32.ser Dev32.ser 4.23I Jun 27 1997
//1/bin/Dev32.par Dev32.par 4.23G Oct 04 1996
//1/bin/Dosfsys Dosfsys 4.23E Jan 21 1997
//1/bin/Net Net 4.25B Jul 27 1998
//1/bin/Net.via Net.via 4.25C Dec 11 1998
//1/bin/Dev32.pty Dev32.pty 4.23G Oct 04 1996
//1//usr/ucb/Socket Socket 4.25G Dec 08 1998
//1/usr/bin/lpsrvr lpsrvr 4.24A Jun 26 1997
//1/
/bin/oisecadm OnCmd Sec 1.00 Oct 15 1997
//1/*/oncmd/bin/oiserve oiserve 5.00 Aug 14 1996

Problem:
Backups greater than 500M fail (partial backups sometimes complete, complete
backups always fail).

The script we have create for backups works flawlessly for combinations of EIDE
and SCSI2 systems (all EIDE, all SCSI2, combination systems). We are just
moving into this combination of LVD/UW drives. We are having no problems with
the data integrity on the hard drives. The problem is with the backups. Upon
check of the tapes, the backup is not complete and is asking for a second tape,
yet the tape is only partially filled (max 1/3 rd of capacity). Consistently it

is short by only a few files (of 19544 files, directories & links, 19479 are
backed up on complete backup).

Is there any similar experience with this? Is there any recommendations?

Thanks

Douglas M. Barker (800) 387-4876 (toll free)
Software Support Engineer (519) 888-9304 (voice)
PC Automation Inc. (519) 888-9085 (fax)
925 Erb St. W., Waterloo email: support@pcauto.com
Ontario, Canada, N2J 3Z4

“Douglas Barker” <dougb@pcauto.com> wrote in message
news:3AC9F867.7FDE1935@pcauto.com

Configuration:
Adaptec 2940UW controller
Seagate Scorpion STD2401LW tape drive
SCSI LVD hard drives (mixed manufactures and sizes)
20 G capacity DDS4 tapes
5 G max data
Problem:
Backups greater than 500M fail (partial backups sometimes complete,
complete
backups always fail).

The script we have create for backups works flawlessly for combinations of
EIDE
and SCSI2 systems (all EIDE, all SCSI2, combination systems). We are just
moving into this combination of LVD/UW drives. We are having no problems
with
the data integrity on the hard drives. The problem is with the backups.
Upon
check of the tapes, the backup is not complete and is asking for a second
tape,
yet the tape is only partially filled (max 1/3 rd of capacity).
Consistently it

is short by only a few files (of 19544 files, directories & links, 19479
are
backed up on complete backup).

Is there any similar experience with this? Is there any recommendations?

Do you have the SCSI cable terminated ? the LVD drives are not self
terminating.
If you do not terminate the cable, you should get a warning from the
controller that
there is insufficient termination. You can continue, but you might get
problems like
you are describing.

-Glenn Sherman

Glen

Yes. Because there is a mixture of devices, primarily the Adaptec contoller is
using UW, the tape drive itself is terminated. I was unable to get anything
working without this termination. I have been able to get some complete backups
but NEVER under the cron.

Glenn Sherman wrote:

“Douglas Barker” <> dougb@pcauto.com> > wrote in message
news:> 3AC9F867.7FDE1935@pcauto.com> …

Configuration:
Adaptec 2940UW controller
Seagate Scorpion STD2401LW tape drive
SCSI LVD hard drives (mixed manufactures and sizes)
20 G capacity DDS4 tapes
5 G max data
Problem:
Backups greater than 500M fail (partial backups sometimes complete,
complete
backups always fail).

The script we have create for backups works flawlessly for combinations of
EIDE
and SCSI2 systems (all EIDE, all SCSI2, combination systems). We are just
moving into this combination of LVD/UW drives. We are having no problems
with
the data integrity on the hard drives. The problem is with the backups.
Upon
check of the tapes, the backup is not complete and is asking for a second
tape,
yet the tape is only partially filled (max 1/3 rd of capacity).
Consistently it

is short by only a few files (of 19544 files, directories & links, 19479
are
backed up on complete backup).

Is there any similar experience with this? Is there any recommendations?

Do you have the SCSI cable terminated ? the LVD drives are not self
terminating.
If you do not terminate the cable, you should get a warning from the
controller that
there is insufficient termination. You can continue, but you might get
problems like
you are describing.

-Glenn Sherman

Douglas M. Barker (800) 387-4876 (toll free)
Software Support Engineer (519) 888-9304 (voice)
PC Automation Inc. (519) 888-9085 (fax)
925 Erb St. W., Waterloo email: support@pcauto.com